Close Menu
Golf Daily
  • Home
  • Features
  • Courses & Destinations
  • Business & News
  • Gear & Technology
  • Blog
Facebook X (Twitter) Instagram
Golf Daily
  • Home
  • Features
  • Courses & Destinations
  • Business & News
  • Gear & Technology
  • Blog
Golf Daily
Home»Courses & Destinations»Myrtle Beach’s Long Bay GC Reopens Following Greens Restoration Project
Courses & Destinations

Myrtle Beach’s Long Bay GC Reopens Following Greens Restoration Project

By August 19, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Long Bay GC
Share
Facebook Twitter LinkedIn Pinterest Email

MYRTLE BEACH, S.C. – Long Bay Golf Club, a Jack Nicklaus design that is one of the Myrtle Beach area’s most popular layouts, reopened Aug. 14 following a comprehensive greens restoration project. 

Founders Group International (FGI), Long Bay’s parent company, closed the course May 17 for an effort highlighted by the installation of TifEagle bermudagrass and the restoration of the layout’s greens to their original specifications. Prior to the project, Long Bay, which opened in 1988, had approximately 70,000-square-feet of putting surface, a number that now stands at nearly 110,000-square-feet. 

“We are so excited to welcome golfers back to Long Bay,” said Brandon Mensinger, Long Bay’s head pro. “Our new greens are in outstanding condition, and we have reclaimed more than 30,000-square-feet of putting surface, dramatically increasing the number of pinnable areas on each green. We are ready to go and golfers can look forward to a smooth, fast roll this fall.”

TifEagle, due to its resistance to mutation and ability to produce an outstanding putting surface, has emerged as the grass of choice for many of Myrtle Beach’s premier courses, including the Grande Dunes Resort Course and Pawleys Plantation, the area’s other Nicklaus design. 

In addition to the greens work, Long Bay also removed all the grass on the surrounding collars and resodded them with Tahoma 419, a hearty variety of bermudagrass that can withstand close mowing and is resistant to mutation. 

The expansion of Long Bay’s greens increased the number of pinnable areas, maximizing the creativity of the Nicklaus design, and it will enhance course conditions over time, allowing the staff to distribute traffic across the entirety of each green complex. 

Located along the North Strand, Long Bay has long been a favorite of traveling golfers. Nicklaus used fairway bunkers and mounding to frame a course that rewards both power and precision. At the heart of Long Bay’s appeal is a back nine that is among the area’s best. 

The short par 4 10th, featuring a fairway ringed by a waste bunker, the island green, par 3 13th, and No. 18, a dramatic dogleg right that plays around a lake, were all ranked among Myrtle Beach’s top 100 holes, underscoring Long Bay’s appeal. 
 
For more information on the course, visit www.LongBayGolfClub.com.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleGolf course architect Kirby, ASGCA Fellow, dies at 90
Next Article Vokey Wedgeworks Introduces Limited Edition 54 M Grind

Related Posts

La Réserve Golf Links in Mauritius surges into Top 30 International Courses

April 3, 2026

Cabot Bordeaux redefines the European golf escape in 2026

April 2, 2026

Landscapes Unlimited Major Renovation Work at Carolina Country Club Nears Completion

April 1, 2026
Leave A Reply Cancel Reply

Search
Podcasts

Tips To Plan Your Golf Trip To Scotland

SPONSORS
Articles

Preview GCSAA’s 2026 Rounds 4 Research online auction with more than 1,200 rounds of golf

April 3, 2026

New Tartan in Tow, Gerrish Embarks on Jam-Packed 2026

April 3, 2026

Concert Golf Partners Pioneers the Installation of FireFly Automatix Robotic Fairway Mowers

April 3, 2026

Arcis Golf launches nationwide ‘Round Up 4 Els For Autism’ campaign

April 3, 2026
Sponsors
About
About

Your source for daily golf news

We're social, connect with us:

Facebook LinkedIn RSS
Popular Posts

Preview GCSAA’s 2026 Rounds 4 Research online auction with more than 1,200 rounds of golf

April 3, 2026

New Tartan in Tow, Gerrish Embarks on Jam-Packed 2026

April 3, 2026

Concert Golf Partners Pioneers the Installation of FireFly Automatix Robotic Fairway Mowers

April 3, 2026

Subscribe to Updates

Get the latest news from GolfDaily.com

Copyright © 2013-2026. Designed by GolfTrips.com.
  • Home
  • Contributors
  • Contact
  • Privacy

Type above and press Enter to search. Press Esc to cancel.